Skip to content

Tunnel Feasibility Study

    CT DOT hired URS Corporation, an engineering and construction consultancy, to do a feasibility study on putting Route 9 in a tunnel through Middletown, published in 2003. URS found that constructing a 1540 ft. tunnel from Court to Green Street would cost approximately $557 million in 2010. See the full report here.

    css.php