Route 9 Project DOT Website
Here is a link to the current DOT website on Route 9. It contains the project’s history, a summary of alternative plans, and updates on… Read More »Route 9 Project DOT Website
Here is a link to the current DOT website on Route 9. It contains the project’s history, a summary of alternative plans, and updates on… Read More »Route 9 Project DOT Website
The city government was required to complete this checklist in 2022 to understand its obligations under the Connecticut Environmental Policy Act (CEPA).
Link to the Council of Environmental Quality statement on Route 17-Route 9 reconfiguration: https://portal.ct.gov/CEQ/DOT/Scoping-Notice/Middletown-Route-17-Route-9
CT DOT commissioned a study in 2019 to analyze the noise impact of a proposed new Route 9 & Route 17 interchange. The study was… Read More »Rt. 9 & 17: Noise Analysis Report (2021)
To remove the traffic signal on Route 9 at the Washington Street interchange (Old Exit 15), a new off-ramp from Route 9 northbound is proposed… Read More »DOT Map of Alternative 11 from 2018
CT DOT hired URS Corporation, an engineering and construction consultancy, to do a feasibility study on putting Route 9 in a tunnel through Middletown, published… Read More »Tunnel Feasibility Study